• In Bangalore it is now mandatory for all complexes with 20 or more flats to set up STP within 3 months
  • Big Relief to Bangalore Apartment Owners- MoEF dilutes Discharge standards on 13-10-2017 to make it easy for STP owners
  • Micro STPs for 20 to 30 Apartments- Faster delivery- Prices start at 5.0 lakhs
  • BBMP issues guidelines on setting up STP in apartments in Bangalore. Details in this website
  • Indus launches 'Zero Discharge Sewage Treatment Plants' & Instant Sewage Treatment Plants 'e-STP'
  • Effluent Treatment Plants for Restaurant, Car Wash & Diary Industry
  • We have launched 'Zero Discharge Sewage Treatment Plant' for 100% recycle of Sewage
  • Channel Associates wanted in All State Capitals

High Quality low cost ETP solutions
Home -  Restaurant ETP

Effluent Treatment Plant For Restaurant

The ETPs would be brought under regulatory mechanism for effective monitoring and pollution control.

Effluent Treatment Plant(ETP)/Sewage Treatment Plant(STP) including proper Oil and Grease 

Trap for the effluent arising from  kitchen and /or laundry.

The Five Star Hotels shall comply with the above mentioned standards and shall also (i) Provide Effluent Treatment Plant / Sewage Treatment Plant to treat the entire waste water generated from the hotel using Biological treatment process.(ii)Treat the waste water upto tertiary level for reuse of the treated effluent at least for Cooling Tower / AC Plant and in horticulture and in flushing of Toilets where ever possible / applicable as prescribed in the Environmental Clearance / Consent  Conditions issued earlier.

The treated effluent shall be reused upto the maximum extent possible to achieve the objective  of zero discharge.The hotels shall submit water mass balance chart regarding consumption of  water  ,waste water generation and use of treated effluent (iii)Provide Rain Water Harvesting System(iv)Install Solar Water Heating System (v)Provide Organic Waste Convertor for composting of organic waste or Waste to Bio –fuel Plant (vi) Convert/Switch over from Oil fired Boiler to Natural Gas based Boiler wherever Gas Supply is available.(vii)Develop Green Belt to create Buffer Zone from main roads.